Natural water treatment station "WRS"


 

Technical data

Name of the installation  Produc-tivity* Dimensions (m) Construc-tion capacity (cu m3) Weight of a station without water (T) Weight of a station in operation (T) Demand on raw materials and resources
Heat (Kcal/hour) Fixed electric power (kwt/hour) Con-sumed electric power (kwt/hour) Ser-vicing perso-nell
WPS-25 25 6.0x3.0x2.8 64 4,5 6,5 3000 10 14
WPS-50 50 6.0x3.0x2.8 64 4,5 6,5 3000 15 20
WPS-100 100 6.0x3.0x2.8 64 4,5 6,5 3000 17 23
WPS-200 200 6.0x6.0x2.8 114 7,5 15 9000 25 35
WPS-500 500 6.0x6.0x2.8 114 7,5 15 9000 40 34
*Productivity at full treatment (Nominal cu m3)

Purpose

Water treatment constructions are meant for removal of surplus concentration of iron , ammonia, dredges, color, anthropogenic organic substances, toxic micro impurities, as well as for disinfection of treated water.

The treated water after treatment has the performance of quality meeting the requirements of sanitary-epidemic inspection 2.1.4.559-96 "Drinking water".

Stations are a completed automated block consisting of a building with mounted high productive equipment for removal of iron, turbidity, color, ammonia concentrations, anthropogenic organic substances, toxic micro impurities, as well as for disinfection and water supply.

All the elements of the system are rated for operation term of not less than 15-20 years.

The operation can happen both in automatic and manual regime acc. o consumer's wish.



Quality performance of initial water

No/No Quality performance Measurement Pollution
1
Iron in general
mg/l
up to 15
2
Ammonia ( nitrogen)
mg/l
up to 5
3
Turbidity
mg/l
up to 2 000
4
Colour
degrees
up to 400
5
Manganese
mg/l
up to 7

    Facilities are meant:

  • with rated winter temperature of outside air till -60 0C;
  • normative snow loading till 320 kgs/sq. m;
  • fast wind till 100 kgs/sq.m;
  • seismic activity till magnitude 9.

 Up


Advantages and peculiarities of WTC

1 The production block of constructions is projected in metal constructions of full prefabrication what allow a quick launching of objects.
2 All the tech. equipment can work both in manual and automated regime.
3 All the equipment at the stations is built in what allows reducing construction volumes and using sites efficiently.
4 The Buildings of stations are compounded of modules with dimensions 3*6*2.8m. The modules are delivered with in them mounted equipment.
5 The above principle of building compounding allows carrying out its mounting at the shortest term at site.
6 The carrying out of construction mounting works is conducted parallel with manufacture of techno blocks of modular execution. With this method of works the volumes of CMW are reduced, there is no necessity to user temporal constructions, depots and heavy machinery on the site. (maximum weight of a block is 6 tones)
7 Technological equipment is made of stainless steel.


Distinction of facilities work

The initial water is pumped from the water source to treatment constructions.

To remove the surplus concentrations of ferrous and ammonia from treating water the method of air oxidizing is being used. The formed flakes of trivalent ferrous Fe3+ are entrapped by filter system loading, and ammonia is blown away in aero-degazing columns. To improve organoleptic features and for fine treatment the special filters are being used.

If it is necessary to extract micro quantities of toxic elements and organic compounds of anthropogenic origin, first of all chloride organic substances, a modular return osmotic installation with high effective ultra filtration roll membranes produced by "Osmonics" company is used. After filtration system the treated water is coming to bactericide installation. As a reserve method chloride tablets are used.

After disinfection the water is coming to pure water reservoir and than it is pumped to a consumer.

To prevent hydraulic blows, as well as for reducing rush loads the hydro pneumatic tanks are connected up in the pressure network.

Acc. to customer's wish the system with changing of pumps supply can be installed.

JOB DESCRIPTION

Water transports from water sours by pumps to sewage treatment station, where, depends from water’s quality, makes a process of stage aeration.

After filtration system, clean water has bacterial treatment.

After antisepsis, water goes to a tank for clean water, then by pumps water goes to consumers.

For exclusion hydraulic hammers and easing on-peak loads water’s transportation system has hydro-combination valves. Depending on customers’ desire, possible to build a pumping feed control system.

Degassing-aeration column. Water, for treating, goes from artesian wells to pressure tubing discharge line, then it goes to degassing-aeration system. This system blows off ammonia, subsisted in bladed water and oxidation solved iron Fe and manganese in the same time. As a result of oxidation iron Fe in the form of Fe2+ dissolved in the water changes to the insoluble form of Fe3+. Manganese is hydrogenated and falls out in Mn(OH) in the form of the higher hydroxides of manganese Mn(OH)3 and the relatively insoluble sediment. Resultant sediment of hydroxide of iron (III) is filtered on the multilayer filters.

Filtration system. Filtration system works in two lines. The saturated with oxygen water will be given to the multilayer filter for the detention of the formed sediment of hydroxide of iron and hydrate of manganese. In the multilayer filter the more complete oxidation of dissolved iron and manganese, reached by filtration through the layer of special load occurs.

Disinfection of water.
Different methods can be used for the disinfection of purified water: disinfection on the bactericidal installation UFO, if necessary, disinfection by calcium hypochlorite.

Process flow sheet of WPS


1. Artesian well 2. Piston pump 3. Reservoir of initial water 4. Pump of initial water 5. Degassing- aeration column 6. System of the removal of iron and manganese 7. System of an improvement in the organoleptic properties of purified water 8. Multi patron filter 9. System of disinfection UFO 10. Knot of preparation and dosing of calcium hypochlorite

 

 To the Main page  Up

Вы можете написать нам по адресу
354071, Россия, г. Сочи, Краснодарский край, Ул. Пасечная, 45
Тел.: (8622) 55-10-08, 55-10-09 Факс: (8622) 55-32-11   E-mail:inecs@sochi.ru   www.inecs.org
Продукция Научная база Виды работ О компании На главную